β BackNotification Regarding Schedule for Conduct of Document Verification followed by Personal Interviews for the Post of Field Engineer (Civil) in NR-II. | govtpvt.com
Tag:Documents
Posted: 21/02/2026
ποΈ POWERGRID
π PSU/Technical
π PDF Attached
π Notification Regarding Schedule for Conduct of Document Verification followed by Personal Interviews for the Post of Field Engineer (Civil) in NR-II.
Post date: 2 April 2026 β’ Source: POWERGRID Official
What this page does
Explains the official notification in plain language: dates, extracted text, and direct secure links to the original document.
Notice Details (Auto-Extracted)
Notice Date: 2 April 2026
Source: POWERGRID
Notification Regarding Schedule for Conduct of Document Verification followed by Personal Interviews for the Post of Field Engineer (Civil) in NR-II.
Key instruction: Document Verification followed by Personal Interviews for the Post of Field Engineer (Civil) in NR-II. This has reference to Advertisement No. CC/03/2025 dated 27.08.2025 and C/HR/Notice-8 dated 21.11.2025 for the Post of Field Engineer (Civil) in NR-II. In this regard, upon submi
Documents Required
Checklist not clearly detected. Please open the PDF for complete details.
View extracted text (raw)
Ref. No.: NR-II/2026/FTE/Notice-02 Date: 04.02.2026
Notification Regarding Schedule for Conduct of Document Verification followed by Personal
Interviews for the Post of Field Engineer (Civil) in NR-II.
This has reference to Advertisement No. CC/03/2025 dated 27.08.2025 and C/HR/Notice-8 dated 21.11.2025 for
the Post of Field Engineer (Civil) in NR-II. In this regard, upon submission of willingness of candidates during
first phase, the schedule for Document Verification followed by Personal Interviews for provisionally shortlisted
candidates for the Post of Field Engineer (Civil) in NR-II is as follows:
Date of Reporting for Document Verification followed by Personal Interview: 13.02.2026 (Friday)
374655 375198 370635 382520 363865 381790 376815 364237 377468 363902 366053 374603
377616 356252 375001 373451 380496 377434 370467 377320 370769 376560 373916 373560
374780 351538 377156 382023 376476 380171 375657 373749 373815 372651 372366 376216
Candidates are advised to check their POWERGRID Login for the copy of call letter pertaining to Document
Verification followed by Personal Interview.
With Best Regards!
NR-II Recruitment Group
Power Grid Corporation of India Limited
-- 1 of 1 --
Important Dates Timeline
1
Notice Issued On
2 April 2026
2
Closing / Last Date
Not mentioned in notice
FAQs β Quick Answers
When was the notification for Notification Regarding Schedule for Cond... published?
The official notification was published by POWERGRID on 2 April 2026.
What is the deadline or closing date for this notice?
The closing date is Not mentioned in notice. Note: If this says "Not mentioned", please verify by opening the official document directly.
How can I view the original document from POWERGRID?
You can view the exact original document or page by clicking the "π Download Official PDF" button in the Important Links section.
Quick Summary
Authority
POWERGRID
Category
PSU/Technical
Department
POWERGRID Jobs
Vacancies
Not explicitly mentioned
Eligibility
Check official notice...
Trending Searches
#powergrid#powergrid recruitment 2026#powergrid notification#powergrid latest update#psu/technical#document verification#dv schedule#certificate verification#notification#verification#interviews#govtpvt#free job alert
